当前位置: 首页 » 资讯 » 工采网 » 国际项目及招标采购信息 » 正文

吉尔吉斯斯坦237 MW上纳伦梯级水电厂

放大字体  缩小字体 发布日期:2017-03-02  来源:山东省国际承包劳务商会
核心提示:投资金额:$ 7.27亿元 EPC 当前进度:2016-12-07 立项 项目编号:I20170222001所属行业:电力 所在地区:中亚 吉尔吉斯斯坦 项目

投资金额:$ 7.27亿元 EPC
当前进度:2016-12-07 立项
项目编号:I20170222001
所属行业:电力
所在地区:中亚 吉尔吉斯斯坦
项目来源:政府
发起人:吉尔吉斯斯坦能源工业部
投资人:上纳伦梯级水电站有限公司
总承包方:待定

项目简介
项目位置:纳伦
立项时间:2012年10月27日
项目性质:发电容量237MW的水电站建设
预计招标时间:2017年第一季度
预计开标时间:2017年第一季度
预计开建时间:2017年第二季度
预计完工时间:2019年第四季度

项目需求
1、发电站建设
2、变电站的建设
3、配套设施建设
4、安装涡轮
5、安装发电机
6、安装变压器
7、输电线路铺设

资金来源
企业自筹

招乎评价
俄罗斯水电公司退出该项目,正寻找新的投资者

项目描述
一、Description
The Ministry of Energy of Kyrgyzstan(MoEK) is undertaking the development of Upper-Naryn Cascade Hydropower plants in Kyrgyzstan.
The project involves the construction of four hydroelectric power plants with combined capacity of 237.7 MW and an output of 942.4 million kW.
The four power plants are Akbulunsky hydroelectric plant, Naryn HPP-1 (GES-1), Naryn HPP-2 (GES-2) and Naryn HPP -3 (GES-3).
The project includes construction of power house, head race tunnels, laying of transmission lines and the installation of turbines, generators, transformers and the construction of related facilities.
Russian Federation’s Ministry of Energy and the Kyrgyzstan’s Ministry of Energy and Industry has signed a Memorandum of Understanding (MoU) for the development of the project.
Russian Federation will provide the joint venture with half of necessary funds while ensuring that the group obtains a loan facility to cover the remaining construction cost. Meanwhile, Kyrgyzstan will contribute land rights and other required necessities.
In May 2013 OAO ESKO-EES is selected as General contractor.
In June 2013 the project was planned to begin the construction works.
OAO ESKO-EES-US has been cancelled as the company is scheduled to close.
The in-house construction division of VN HPP is undertaking the construction work on the project.
JSC Lenhydroproject is a subsidiary of Rushydro is appointed to perform engineering survey and preparation of design documentation.
In October 2014, Construction activities on this project were commenced.
In December 2015, JSC Electric terminated the contract with JSC RusHydro due to regulatory issues.
MoEK is in search of the potential investor to implement the project.
二、Background
The project is being developed in on River Naryn, Kyrgyzstan.
Since 2009 the project is in talks but, officially announced in 2012.
The project aims to enhance power generation capacity using an available natural resource to meet the growing demand for power in Kyrgyzstan.
The main aim of the project is to meet the growing needs of power and reduce dependence on other provinces.
The power generated from the four stations will be utilized for mining and processing industry and the population of Naryn region of Kyrgyzstan, as well as for export to neighbouring countries.
Initially, the project was developed by a joint venture between JSC RusHydro and JSC Electric

项目顾问
肖先生15928578899

 
 
[ 资讯搜索 ]  [ 加入收藏 ]  [ 告诉好友 ]  [ 打印本文 ]  [ 关闭窗口 ]

 
0条 [查看全部]  相关评论

 
推荐图文
推荐资讯
点击排行